Specifications

Specifications

specification_859
Class: Gearing:
Name: ​NORRIS
Hull Number: 859
Builder: Bethlehem Steel Corporation, Sand Pedro, Ca.
Keel Laid: ​24 August, 1944
Launched: 25 February, 1945
Commissioned: 9 June, 1945
Displacement: 2,425 Tons
Length: 390' - 6"
Beam: ​42' - 6"
Speed: 31.5 knots
Weapons: 1945 (6) 5-inch 38 w/mk37 directors
Weapons: 1945 (5) 40mm w/mk63 directors
Weapons: 1945 (​20) ​20mm w/mk14 ​sites
Weapons: 1945 (​6) ​depth charge projectors (K-Guns)
Weapons: 1945 (5) ​300lb chargers per gun
Weapons: 1945 (5) ​21 inch torpedo tubes
Weapons: 1945 (​2) ​banks of mk15 mod3
Weapons: 1945 (​2) ​tracks of depth charges (stem tracks)
Weapons: 1945 ​8600lb charges per track
Weapons: After 1949 (4) 5-inch 38 w/mk37 directors
Weapons: After 1949 ​(1) Hedgehog depth charge battery
Weapons: After 1960 FRAM II (4) 5-inch 38 w/mk37 directors
Weapons: After 1960 FRAM II (2) Triple mk32 torpedo tubes
Weapons: After 1960 FRAM II (1) Hedgehog battery
Weapons: After 1960 FRAM II (2) D.A.S.H (drone anti-submarine helicopter)
Machinery: (4) Boilers
Machinery: Pressure: 565lbs
Machinery: Temperature: 850° F
Machinery: (2) Turbines
Share by: